Most of the excavated paths in the new area are now covered with stabilized gravel, and the area has been leveled out to the pavilion building. Along the lower part of the Bangsbo pines, the soil has been leveled and prepared for milling. The plan is that when the very last stabilized gravel is placed, the main paths will be covered with castle gravel, like all other paths in the Botanical Garden.
The sunny September weather is still bringing many flowers to the Garden's other facilities, and they can easily be enjoyed for a long time yet.
Image gallery




