All cross beds in the new area have now been dug, and when the changeable Danish weather permits, they will be milled. The flower field has also been dug, and three old tree stumps have been placed, which are home to mushrooms, insects and other small creatures.
Here, the laid out sand must also be milled down when the time is right.
And now the installation of the Bysted lamps has begun – it will be exciting to see when the power is turned on.
Image gallery




